Care Energy & Buildings / Leadership tools
A stronger review. A better next decision.
Use these proportionate tools to organise evidence, test assumptions and prepare a clear brief. They support the conversation between finance, estates, managers and governing boards.
Care Circle Network Editorial Desk · Reviewed 12 November 2026
01 / Prepare the decision
A readiness review
for your next meeting.
Tick what the service has evidence for. This is a meeting aid, not a compliance rating or technical approval. Your selections stay in this open page and are not submitted.
Assign an owner and next date to each outstanding area before asking for an investment decision.
02 / Explore an illustrative scenario
Heating economics,
with the assumptions visible.
The starting values are examples, not market quotations, design advice or a forecast. Enter a surveyed heat requirement, applicable tariffs and credible seasonal performance to explore the relationship.
Illustrative annual comparison
- Existing boiler fuel cost
- £6,667
- Heat pump electricity cost
- £7,813
- Net annual operating difference
- -£1,646
- Energy-only break-even SPF
- 3.75
- Proposed capital less confirmed grant
- £45,000
- Simple capital recovery
- No positive operating difference
A negative figure means higher modelled annual operating cost under these assumptions. It is not a verified saving.
Complete the appraisal before deciding
This simple model excludes discounting, finance, tax, standing charges, future price changes, replacement cycles, degradation and unentered costs. It assumes the same annual useful heat is delivered. It does not prove comfort or hot-water suitability.
The capital line uses the proposed project's net outlay. A proper investment appraisal also compares the realistic cost of maintaining or replacing the existing system. A simple recovery period is not a full project return.
Calculation method and useful checks
Boiler fuel cost = useful heat ÷ seasonal boiler efficiency × gas p/kWh ÷ 100. Heat pump electricity cost = useful heat ÷ seasonal performance factor × electricity p/kWh ÷ 100. The annual difference deducts the additional annual cost entered.
The energy-only break-even seasonal performance factor is boiler efficiency × electricity price ÷ gas price. It excludes maintenance and capital. Request a competent whole-system assessment of heat loss, emitters, electrical supply, hot water, enabling works and continuity.
Review records / expanded 12 November
Clear decisions.
Practical review records.
Use the questions with the relevant leaders. Record findings, actions, due dates and verification. The records are completed locally. You may adapt and share the publisher’s worksheets within your organisation under our worksheet permissions.
14-day heating controls review
Read the supporting featureElectricity charge and capacity review
Read the supporting featureShared heating responsibilities review
Read the supporting featureBefore renewal: build the care-provider energy file
Read the supporting featureFixed does not always mean the whole bill is fixed
Read the supporting featureOne care group, several contracts: should renewals be brought together?
Read the supporting featureWhen the market moves, what should change in your procurement decision?
Read the supporting featureWhat a useful energy-broker review should deliver
Read the supporting featureCare energy before winter: the decisions that protect budgets and support better care
Read the supporting featureBeyond the unit price: care-provider service review
Read the supporting featureDid the energy decision work? A care-provider guide to measuring the outcome
Read the supporting featurePost-Budget care energy decision record
Read the supporting feature2027 care energy budget: ten questions to resolve
Read the supporting featureCare energy adviser appointment review
Read the supporting feature03 / Downloadable working records
Take the evidence
into your own workbook.
CSV templates open in common spreadsheet applications. They contain headers and a blank row for your own data. Keep resident names and unnecessary personal information out of shared energy records.
Energy and contract baseline
Record meter boundaries, quantities, dates, charges and evidence gaps.
Ownership and project responsibilities
Connect the operator, owner, funder, permissions and continuing obligations.
Provider group site register
Link sites, entities, supplies, tenure, condition and the next decision.
Performance reviews at 30, 90 and 365 days
Track consumption, costs, comfort, faults and accountable actions.
Whole-project options brief
Compare capital, enabling works, retained costs, care conditions and the alternative.
04 / Use the result responsibly
Connect the workbook to the care service.
Before commitment
Confirm scope, ownership, technical assessment, applicable duties and complete costs. Verify any funding before starting work or paying a deposit.
Ownership and permissionsDuring delivery
Make disruption, temporary arrangements and local escalation part of the agreed plan. Give the manager a workable role in acceptance and handover.
The resident-first project briefAfter installation
Review actual operation through the seasons. Keep price, tax, consumption, full costs and any decision to reinvest resources separately visible.
The continuing performance review