Energy and contract baseline
Record meter boundaries, quantities, dates, charges and evidence gaps.
Independent UK care editorial Evidence · leadership · action
See the change. Examine the evidence.
Understand what it means for care.
Care Energy & Buildings / Leadership tools
Use these proportionate tools to organise evidence, test assumptions and prepare a clear brief. They support the conversation between finance, estates, managers and governing boards.
Care Circle Network Editorial Desk · Reviewed 19 October 2026
01 / Prepare the decision
Tick what the service has evidence for. This is a meeting aid, not a compliance rating or technical approval. Your selections stay in this open page and are not submitted.
Assign an owner and next date to each outstanding area before asking for an investment decision.
02 / Explore an illustrative scenario
The starting values are examples, not market quotations, design advice or a forecast. Enter a surveyed heat requirement, applicable tariffs and credible seasonal performance to explore the relationship.
Illustrative annual comparison
A negative figure means higher modelled annual operating cost under these assumptions. It is not a verified saving.
This simple model excludes discounting, finance, tax, standing charges, future price changes, replacement cycles, degradation and unentered costs. It assumes the same annual useful heat is delivered. It does not prove comfort or hot-water suitability.
The capital line uses the proposed project's net outlay. A proper investment appraisal also compares the realistic cost of maintaining or replacing the existing system. A simple recovery period is not a full project return.
Boiler fuel cost = useful heat ÷ seasonal boiler efficiency × gas p/kWh ÷ 100. Heat pump electricity cost = useful heat ÷ seasonal performance factor × electricity p/kWh ÷ 100. The annual difference deducts the additional annual cost entered.
The energy-only break-even seasonal performance factor is boiler efficiency × electricity price ÷ gas price. It excludes maintenance and capital. Request a competent whole-system assessment of heat loss, emitters, electrical supply, hot water, enabling works and continuity.
03 / Downloadable working records
CSV templates open in common spreadsheet applications. They contain headers and a blank row for your own data. Keep resident names and unnecessary personal information out of shared energy records.
Record meter boundaries, quantities, dates, charges and evidence gaps.
Connect the operator, owner, funder, permissions and continuing obligations.
Link sites, entities, supplies, tenure, condition and the next decision.
Track consumption, costs, comfort, faults and accountable actions.
Compare capital, enabling works, retained costs, care conditions and the alternative.
04 / Use the result responsibly
Confirm scope, ownership, technical assessment, applicable duties and complete costs. Verify any funding before starting work or paying a deposit.
Ownership and permissions ↗Make disruption, temporary arrangements and local escalation part of the agreed plan. Give the manager a workable role in acceptance and handover.
The resident-first project brief ↗Review actual operation through the seasons. Keep price, tax, consumption, full costs and any decision to reinvest resources separately visible.
The continuing performance review ↗