Your first review
Bring three documents. Resolve one question.
Gather a recent bill, the full contract with its price schedule, and twelve months of consumption records. Then ask: which costs could change for our home in 2027?
- The price is fixed and the scope is confirmed
- Use the agreed terms until their end date, check invoices and prepare for renewal.
- Some charges can change
- Ask which charge, under which clause, from what date and by how much in pounds.
- The answer is unclear
- Request a written explanation from the supplier or a scoped specialist review. Keep the renewal deadline in view.
Our suggested review routes. Your actual agreement determines the answer.
Wholesale electricity · Great Britain
Daily market intelligence.
Context for your next energy decision.
Follow observed wholesale electricity movements and understand the questions they raise for renewal. Your contracted tariff, gas prices, network charges and taxes are separate.
48/48 intervals · daily mean
8 Nov 2026 to 14 Nov 2026
Complete intervals · preceding week comparison
Checking recent observations. The verified archive is shown. Data through 14 Nov 2026 (UTC). Source retrieved: 15 Nov 2026, 04:03 UTC.
Observed wholesale electricity. Care tariffs, gas and forward quotations are separate. This indicator does not establish a home's renewal cost.
Open the electricity desk, chart and coming changesStart with your home, not a national percentage
A forecast increase in network charges raises a practical question: how much more should the home budget? Start with its agreement. Different bill components, and separate supplies within the organisation, may have different terms.
Gather a recent invoice, the full supply agreement and price schedule, and twelve months of consumption records. Request missing documents from the supplier. For a group, collect these for each supply and identify who pays. The first deliverable is an explanation that reconciles to the bill.
Understand the five parts of the bill
The electricity bill covers energy, networks, system balancing, other contractual or policy costs, and tax. The supplier may bundle these into a unit rate and standing charge or list them separately. Request an explanation that reconciles to the total without counting bundled charges twice.
Transmission Network Use of System, usually shortened to TNUoS, pays towards the high-voltage transmission network. It is one component of the bill. In its October forecast, the National Energy System Operator (NESO) describes much of the demand charge as daily amounts for each site, with additional location-related elements. These published network tariffs are not the same as a supplier’s all-in standing charge. [1]
Reducing consumption may leave a fixed daily network component unchanged. Calculate efficiency savings against the charges actually avoided, while keeping retained costs visible.
Find out which costs can change
Ask your supplier or broker: which parts of this agreement are fixed, for how long, and which can be updated, reconciled or passed through? Ofgem describes fixed-rate contracts as fixing unit rates and standing charges. Its more detailed guidance also notes that some agreements contain conditions allowing rates to change. Ask what is included in your particular fixed price and request the relevant clause for any claimed exception. [5]
Check that wording before assuming that a national charge forecast overrides an agreed price. The budget should identify the contractual route and effective date of any change.
Ofgem’s business-contract guidance asks customers to check the contract type, term, fees, protections and what happens when it ends. Its intermediary guidance supports clear principal terms, market coverage and remuneration, while distinguishing its developing regulatory framework from current requirements. A useful specialist should make those matters easier to understand. [2] [3]
For a group, compare each site's end date and charging treatment. Include landlord-billed locations and recently acquired homes. Confirm the legal customer and signing authority before assuming one purchasing decision covers the estate.
What would an increase mean in pounds?
Consider a fictional annual electricity bill of £40,000, containing £5,000 of charges exposed to a particular change. If that element rose by an assumed 20%, with every other cost unchanged, the additional cost would be £1,000. The resulting £41,000 bill is 2.5% higher, not 20% higher. This is arithmetic using invented inputs, not a forecast or a typical care-home bill.
The example assumes a full-year change passed through completely. A real agreement might absorb it, apply it at renewal or calculate it differently. Quantities, tax and other charges may also change. Ask for the affected amount, timing and calculation before approving the budget.
From a headline to your budget
A change to one cost is not the same as a change to the whole bill
Your next question: which part of our bill is affected, and when would the change reach us? Ask for the answer in pounds and the contract clause supporting it.
Optional evidence: see selected published network charges
This selection from NESO’s 30 October revised forecast shows one transmission component. The labels identify charging bands, not care-home sizes. Your supplier must confirm the applicable band and contractual treatment.
| Published band | Published £ per day | Annual equivalent |
|---|---|---|
| LV_NoMIC_1 | £0.308639 | £112.65 |
| LV1 | £6.793444 | £2,479.61 |
| LV2 | £15.107212 | £5,514.13 |
Source: NESO five-year view, version 3, Table 15, printed page 27; checked 4 November 2026. The selected 2027/28 figures are unchanged from version 2. Forecasts can change. These figures exclude other network elements, energy, supplier costs and tax. They are not retail quotations, whole bills or estimates assigned to your home.
A manageable first week
- Gather the documents and list the questions you cannot yet answer.
- Ask the supplier or broker for a cost explanation and the relevant contract terms.
- Review demand with the manager and maintenance lead, protecting care and safety.
- Record confirmed costs, open questions, owners and the next review date.
Ask which charging band applies to each supply
NESO's forecast tables contain different daily amounts by band. The evidence panel annualises selected amounts, with original codes in an expandable note. These codes do not describe care-home types or sizes; ask the supplier to identify the applicable band. [1]
A charging band is a category used to allocate a fixed network cost. Ask the supplier to confirm yours, the basis for it and how its cost appears in the agreement. Ask whether the published amount is included in the price or can be charged separately.
Ask for a documented investigation through the appropriate supplier or network route if the record appears inconsistent with the site. A fall in consumption does not establish an immediate change of band.
Any proposal to change agreed electrical capacity needs competent assessment of the building’s real demands and planned equipment. A future heating project, kitchen alteration or extension may need that capacity. A smaller charge is not a sound outcome if it leaves the service unable to operate safely or creates avoidable future costs.
Build a consumption forecast around care
Gather twelve months of reliable electricity and gas quantities, separating actual and estimated readings. Then explain what will differ in 2027: occupied rooms, nursing needs, opening or closing areas, laundry arrangements, hot-water use, catering and new equipment. For homecare offices or supported living, establish which energy costs the organisation controls before importing a residential-home model.
Use overnight and weekend records to investigate unexplained use. Care runs around the clock, so an overnight load is not automatically waste. Ask the manager and maintenance lead which equipment must operate, which schedules look wrong and what checks can be made without compromising warmth, ventilation, water safety or clinical needs. Record any intervention and verify its effect.
DESNZ's September 2026 release covers 2024 consumption in England and Wales. Its supporting tables use a broad Health category, which cannot establish a care-home benchmark or an appropriate target for an individual service. [4]
For your own estate, compare like periods and explain differences in floor area, occupancy, service and heating fuel. Energy per square metre or occupied bed can prompt questions, but a lower figure does not by itself prove better performance. Keep electricity and gas separate, and investigate the reason before setting a reduction target.
Reduce waste while protecting the care day
Start with faults and mismatched settings: lights in empty areas, failed sensors, equipment left on unnecessarily or heating schedules that do not fit how a room is used. Ask a competent maintenance lead to check them with the manager. Record the change, resident feedback and subsequent consumption before deciding whether it worked.
Energy savings must sit alongside safe care. The Care Quality Commission’s England premises guidance retains provider responsibility when maintenance is contracted out. Health and Safety Executive guidance links hot-water management with both scalding and legionella risks. Do not change water-safety settings to meet a budget target. Use the home’s established safety arrangements and competent advice. [6] [7]
Build a budget with room for uncertainty
Use current contracted costs where they apply. Identify the period needing a new quotation, the charges still uncertain and the assumptions behind them. Keep tax treatment separate, including the Budget developments covered in our preceding feature. Show an alternative outcome for the unresolved element, with the assumption named, rather than presenting a single precise total as certain.
Before approval, reconcile the annual plan to individual sites and ask how actual invoices will be checked against it. Where a bill rises, ask first whether the quantity, rate, billing days, tax or a correction changed. Give each unexplained difference an owner and a date.
A practical review can finish with a confirmed position, an evidenced correction or a well-defined question for support. It should not finish with an unsupported promise that energy will become cheaper.
12 November continuation: give the budget a review timetable
NESO's published timetable schedules draft 2027/28 transmission tariffs by 30 November 2026 and final tariffs by 31 January 2027, subject to possible timetable changes. Keep the present forecast labelled and commission the TPI to explain any later revision in pounds for each affected supply, against its contract terms. A publication date does not establish an automatic retail price increase. [8]
Qualifying electricity in Great Britain is temporarily zero rated through 30 June 2027 under the current HMRC notice. Use the programme's tax review to establish the account's qualifying-use evidence and assumptions after that period. Residential care and a separate office need their own assessment. [9]
Check Climate Change Levy liability before applying a rate. Domestic use and qualifying charity non-business use are excluded from the main rates. Where chargeable, electricity and gas rise from 0.801p per kWh to 0.827p from 1 April 2027. A published rate alone does not create a care-provider liability. [10] [11]
The updated commissioning feature connects these checks to a clear TPI service brief. Agree responsibility for monitoring announcements, obtaining supplier explanations, checking invoices and reporting exceptions. The provider's care and technical leads should retain authority over changes affecting residents, equipment and service continuity.
The next conversation should be easier
Ask the supplier, broker or finance lead for plain answers, supporting documents and an exception owner. Professional support can explain charges, compare quotations and pursue billing issues. Agree its scope and fees first.
Bring the options, uncertainties and next review date to the board. Retain quotations and calculations so later results can be explained. Leaders should understand the assumptions, costs that could change and the next action.
Practical next steps
Put the review into motion.
- Ask which costs are fixed and which can change, with the relevant contract clauses.
- Confirm each supply’s charging band and how network costs appear on the bill.
- Reconcile twelve months of quantities with the service and estate planned for 2027.
- Show the affected cost element and timing before applying a percentage increase.
- Agree an invoice check, exception owner and board review date.
- Schedule the next tariff check and record temporary VAT assumptions and levy chargeability separately for each supply.
From evidence to action
2027 care energy budget: ten questions to resolve
Use this working record with the relevant leaders. Add your findings, evidence reference, action, due date and verification. Suggested owners should be adapted to your organisation.
| Review area | Suggested owner | Question to resolve |
|---|---|---|
| Bill explanation | Finance / supplier | Can you show which costs make up our bill without double-counting bundled charges? |
| Fixed and variable | Supplier / broker | Which charges can change, under which clauses and from what date? |
| Charging band | Supplier | Which residual charging band applies to each supply and what evidence supports it? |
| Network forecast | Specialist adviser | Which published tariff and comparison period support the budget assumption? |
| Renewal | Procurement | What ends when, who can sign and what happens if no new contract is agreed? |
| Consumption | Manager / estates | Does next year’s demand reflect occupancy, services, equipment and essential overnight use? |
| Comparison | Finance / estates | Are the period, floor area, service and fuel basis comparable? |
| Tax | Finance / tax adviser | Which treatment is confirmed and which assumption awaits legislation or clarification? |
| Support | Accountable executive | What work, fee and evidence of completion are we agreeing with the specialist? |
| Control | Finance / board | Who checks invoices, resolves exceptions and updates the budget? |
For the next leadership meeting
Questions to resolve.
- Can we explain the proposed budget without relying on an unexplained percentage?
- Which question needs specialist support, and what evidence will that support deliver?
Sources and evidence boundaries
What supports this feature.
- Five-Year View of TNUoS Tariffs 2027/28–2031/32, version 3
National Energy System Operator · 30 October 2026; checked 4 November
Printed page 27, Table 15. The selected 2027/28 residual tariffs are unchanged in version 3; annual equivalents use 365 days. These are forecasts, not retail quotes, and no band is assigned to a care provider.
- Get a business energy contract
Ofgem · Checked 28 October 2026
Contract type, term, fees, customer protections and end-of-contract treatment. Individual wording still matters.
- Setting up energy contracts: good practice
Ofgem · 20 July 2026; checked 28 October
Intermediary service and transparency expectations. Developing rules are distinguished from current requirements.
- ND-NEED 2026 report, methodology and supporting tables
Department for Energy Security and Net Zero · 30 September 2026; consumption through 2024
Report and supporting workbook reviewed. Broad Health category is not a care-home benchmark. Geographic, sample and denominator limitations apply.
- Set up a business energy contract: detailed fixed-rate guidance
Ofgem · Indexed guidance checked 28 October 2026; current page redirects to updated contract guidance
Fixed prices and contractual conditions. Check the actual agreement before accepting any assertion that a rate can change.
- Regulation 15: premises and equipment
Care Quality Commission · Updated 16 May 2025; checked 28 October 2026
England registered-service scope. Contracting maintenance does not remove provider responsibility; application to a person’s own accommodation differs.
- Scalding and burning in health and social care
Health and Safety Executive · Checked 28 October 2026
Hot-water and hot-surface risks, with legionella controls considered alongside scald prevention. Not a generic temperature-reduction instruction.
- TNUoS tariff forecast timetable for 2027/28 tariffs
National Energy System Operator · Revised 30 September 2026; checked 12 November 2026
Draft tariffs scheduled by 30 November 2026 and final tariffs by 31 January 2027, subject to variation. Existing version 3 forecast evidence retains its separate check date.
- Fuel and power: VAT Notice 701/19
HM Revenue & Customs · Updated 28 October 2026; checked 12 November 2026
Current qualifying GB electricity endpoint. The tax review carries the detailed care-use and mixed-use interpretation.
- Climate Change Levy: reliefs and special treatments, Excise Notice CCL1/3
HM Revenue & Customs · Updated 24 March 2026; checked 12 November 2026
Domestic and qualifying charity non-business exclusions apply on their own facts. A care organisation can hold supplies with different treatment.
- Climate Change Levy rates
HM Revenue & Customs · Updated 27 November 2025; checked 12 November 2026
Main rates for electricity and gas are £0.00801/kWh from 1 April 2026 and £0.00827/kWh from 1 April 2027, only where chargeable.
Practical recommendations are Care Circle's editorial interpretation. Publication, observation and review dates describe different things. A cited professional source is attribution, not an endorsement.
Explore the programme evidence atlas