Care Energy & Buildings / Procurement intelligence

A stronger energy decision.
More confidence for care.

Understand the market. Prepare the renewal. Know what good support delivers. Independent investigations and practical records for the people responsible for care-provider energy decisions.

8 connected investigations and guidesLive wholesale electricity context4 decision-pack records27 October 2026 editorial review

New investigations / 27 October

The industry evidence.
The provider decision.

Begin with the winter investigation. Continue into the service a good broker provides and the evidence needed to establish whether an energy decision worked.

Observed electricity · Great Britain

Daily market intelligence.
A clearer view of the bill.

APXMIDP · all available half-hours
Latest UTC day · 25 Oct 2026£63.26/MWh

48/48 intervals · daily mean

Latest 7 observed days£133.88/MWh

19 Oct 2026 to 25 Oct 2026

Two consecutive 7-day windows-18.1%

Complete intervals · preceding week comparison

Checking recent observations. The verified archive is shown. Last observation: 25 Oct 2026. Source retrieved: 26 Oct 2026, 09:19 UTC.

What the observed movement means

The latest observed week eased. The contract decision still needs its own evidence.

The interval-weighted mean for 19 Oct 2026 to 25 Oct 2026 was £133.88/MWh, 18.1% below the preceding seven-day window. Both windows have complete half-hour coverage.

Provider action: Check the renewal window, obtain a quotation with an expiry time and compare the full cost boundary. A spot-market movement does not establish a future retail price or justify a contract decision on its own.

Market calculation follows the displayed observations. Editorial action guidance reviewed 27 October 2026. Gas, forward quotations and individual care tariffs remain separate.

Observed wholesale electricity. Care tariffs, gas and forward quotations are separate. This indicator does not establish a home's renewal cost.

Open the electricity desk, chart and coming changes

Current industry watch / reviewed 27 October

Three developments to bring into the review.

Fresh winter evidence

The CPA’s 13 October survey announcement seeks new evidence for DHSC. It is an evidence exercise, not a published estimate of providers’ cost increases.

Read the sector call ↗

Future network costs

NESO’s 14 October five-year view forecasts future transmission charges. Check quotation boundaries; this publication does not change 2026/27 tariffs.

Read the forecast and assumptions ↗

Supplier and meter readiness

The scheduled MHHS supplier milestone is 28 October. Ask about your supply point and data access; do not assume every meter has migrated.

Prepare the meter review ↗

Choose your starting point

What needs
a decision now?

A single home, a growing group and a mixed estate can need different support. Start with the issue you can evidence.

Care-property evidence

The building matters
as much as the rate.

These sources sharpen the questions. Your bills, operating record and assessment complete the picture. Sample findings are not individual savings promises.

2025 report · operating year 2024/25

Knight Frank

Read the original source ↗

Finding: Sample utilities costs were £1,903 per bed for conversions and £1,777 for purpose-built homes.

Practical use: Check the reporting boundary, occupancy, building type and period before comparing your own costs.

Boundary: Historical utilities expenditure, not electricity alone, a current tariff or an achievable saving.

Retrofitting analysis · 28 April 2025

Christie & Co

Read the original source ↗

Finding: Its care-property analysis associates higher EPC ratings with lower heat-and-light costs per bedroom and square metre.

Practical use: Investigate the building and current operating evidence alongside the procurement review.

Boundary: An association in its property-related sample does not isolate the saving from an upgrade. Current legal requirements need separate official checks.

Care-home development commentary · 28 August 2026

Savills

Read the original source ↗

Finding: Its care-building commentary connects round-the-clock operation with asset resilience, comfort and environmental design.

Practical use: Include planned estate changes and necessary care conditions in the consumption brief.

Boundary: Professional design commentary, not a measured operating-cost trial or supplier quotation.

Bring the provider structure into the review.

Our care-estate research separates location size, provider relationships and certificate evidence. Use it to ask who controls a decision and which building needs investigation. It does not establish metered consumption, purchasing intent or a current savings figure.

Explore Care Circle’s estate and EPC findings ↗

The provider decision pack

Take a clearer brief
into the conversation.

Four connected working records, a completed fictional example and a decision trail. Use the pack with finance, estates and the person authorised to approve the agreement.

01

Renewal brief

02

Quotation comparison

03

Portfolio options

04

Board decision

Open the records and worked example ↗

June–October coverage journey

The foundations
behind the decision.

The earlier coverage periods are retrospective analysis published on 27 October, alongside current guidance. Original publication and evidence dates remain visible.

01 / June 2026 position · retrospective analysis published 27 October

Before renewal: build the care-provider energy file

A better renewal starts with an accurate account of the service, supply and decision. Assemble the evidence that lets a care provider compare options without confusing missing information with commercial certainty.

Published 27 October 20266 min read

02 / July 2026 position · retrospective analysis published 27 October

Fixed does not always mean the whole bill is fixed

A fixed label is the beginning of a contract review, not its conclusion. Understand the cost boundary, assumptions and permissions before comparing a care service’s next energy agreement.

Published 27 October 20266 min read

03 / August 2026 position · retrospective analysis published 27 October

One care group, several contracts: should renewals be brought together?

A common renewal date can simplify administration, but the right portfolio strategy begins with different buildings, service demands and contractual commitments. Establish what should be shared before treating the estate as one purchase.

Published 27 October 20266 min read

04 / September evidence position · retrospective; separate 27 October market update

When the market moves, what should change in your procurement decision?

A market movement should sharpen a care provider’s questions about exposure, timing and budget tolerance. It cannot determine the right contract without the organisation’s own evidence.

Published 27 October 20266 min read

05 / October 2026 · current provider decision guide

What a useful energy-broker review should deliver

A worthwhile review leaves a care provider with an understandable comparison, transparent remuneration, controlled authority and a decision it can defend. The quality is in the evidence and delivery.

Published 27 October 20267 min read

Specialist perspective

Useful expertise.
Visible contribution.

A good review brings clarity to the brief, the contract and the outcome. Our programme explains what that work should deliver.

Explain the decision

Care-specific explanations and annotated examples help leaders understand the options and their implications.

Show the evidence

Case studies need a defined baseline, complete costs and clear attribution of procurement and efficiency outcomes.

Support the next step

Named specialist introductions follow the provider’s agreement. Any future partner contributions will be identified and editorially reviewed.

Discuss contributing specialist expertise ↗